SUPPLY AND INSTALLATION OF BUS STOP SHELTERS FOR THE SERVICE OF THE PASSENGER PUBLIC OF THE MUNICIPALITY OF ELASSONA

PROJECT TITLE: “Supply and installation of bus stop shelters for the service of the passenger public of the Municipality of Elassona”

OPERATIONAL PROGRAM: PHILODEMOS II

CALL: CALL V: 4721/23-01-2019

INTEGRATION DECISION: 31838/23-04-2021

BENEFICIARY: MUNICIPALITY OF ELASSONA

PROJECT OWNER: MUNICIPALITY OF ELASSONA

INTEGRATION BUDGET, (TOTAL): €50,489.08

INTEGRATION BUDGET, (ELIGIBLE EXPENDITURE): PDE MINISTRY OF INTERIOR SAE 055 2017SE05500010 €50,000.00

Within the framework of implementing Call V of the PHILODEMOS II program, fourteen (14) intercity bus stop shelters will be supplied and installed to serve passengers, aiming for their safest possible travel and protection from prevailing weather conditions.

CONSTRUCTION OF A SHELTER FOR STRAY COMPANION ANIMALS IN THE MUNICIPALITY OF ELASSONA

PROJECT TITLE: “Construction of a shelter for stray companion animals in the Municipality of Elassona”

OPERATIONAL PROGRAM: PHILODEMOS II

CALL: CALL V: 4721/23-01-2019

INTEGRATION DECISION: 31838/23-04-2021

BENEFICIARY: MUNICIPALITY OF ELASSONA

PROJECT OWNER: MUNICIPALITY OF ELASSONA

INTEGRATION BUDGET, (TOTAL): €452,000.00

INTEGRATION BUDGET, (ELIGIBLE EXPENDITURE): PDE MINISTRY OF INTERIOR SAE 055 2017SE05500010 €372,000.00

In the Municipality of Elassona, there is a large number of stray animals which, despite the efforts of volunteer organizations, cannot be fed and cared for. Consequently, phenomena of animal grouping and attacks on people or other animals are observed. Also, small animals continuously appear, given that adult animals are not spayed. The creation of the shelter will address the phenomena described above and provide a definitive and appropriate solution for the management of stray companion animals.

The project concerns the construction of a shelter for stray companion animals in the Municipality of Elassona, Larissa Prefecture.

The shelter will be constructed approximately 0.5 km south-east of the settlement of Stefanovouno, on a plot of land covering 16,731 m2. The plot is located in a rural area.

The shelter consists of two main building facilities:

A) The administration-clinic building

B) The guest animal accommodation building.

The administration-clinic building has an area of 103.60 m2 and is a conventional single-story structure housing the following spaces:

A) The administration and management office of the facility, measuring 3.0 x 3.2 m.

B) Staff room, measuring 3.2 x 3.2 m

C) Food and material storage room, measuring 3.0 x 3.45 m.

D) Food preparation room, measuring 3.0 x 4.4 m.

E) Small animal clinic room, measuring 3.8 x 3.3 m.

F) Isolation room for sick animals, measuring 3.7 x 3.30 m.

G) 2 WCs, one of which is adapted for people with disabilities.

H) Changing room, measuring 1.5 x 3.45 m

The building will be supplied with water from the DEYA Elassona water supply network.

The guest animal accommodation building will be prefabricated, rectangular in plan, with an area of 304.10 m2, industrially constructed with a load-bearing structure of hot-galvanized structural elements connected by appropriate fasteners. The building is divided into 30 internal compartments, each measuring 2.0 x 2.0 m, and 30 external compartments, also each measuring 2.0 x 2.0 m. In this way, the shelter can accommodate a total of 30 dogs. The surrounding area will also be landscaped.

MAINTENANCE - RECONSTRUCTION OF SPORTS FACILITIES IN THE MUNICIPALITY OF ELASSONA

PROJECT TITLE: Maintenance – Reconstruction of sports facilities in the Municipality of Elassona

OPERATIONAL PROGRAM: PHILODEMOS II

CALL: CALL IV: 2225 / 14-01-2019

INTEGRATION DECISION: 44780/16-07-20 ADA: Ω96646ΜΤΛ6-ΜΝΟ (Amendment of 85822 / 3-12-2020 (ADA: 691Λ46ΜΤΛ6-7ΨΒ)

BENEFICIARY: MUNICIPALITY OF ELASSONA

PROJECT OWNER: MUNICIPALITY OF ELASSONA

INTEGRATION BUDGET, (TOTAL): €1,200,000.01

INTEGRATION BUDGET, (ELIGIBLE EXPENDITURE): PDE MINISTRY OF INTERIOR SAE 055 2017SE05500010 €600,000.00

This concerns the maintenance – reconstruction of the following football fields:

1. Central Stadium of Elassona Municipality

2. Tsaritsani Stadium

3. Drymos Stadium

4. Evangelismos Stadium

5. Vlachogianni Stadium

At the sports centers, the surface soil substrate will be removed and refilled, soil slopes will be shaped using a laser, prepared turf will be installed, and final line marking will be done. A new irrigation network will be constructed, and the necessary works to improve the drainage of the playing fields will be carried out, by creating drainage channels. The final height of the existing football goals and the line marking of the playing field, after the completion of the works, must comply with the specifications of the General Secretariat of Sports. In addition, only at the central Elassona stadium, a canopy will be constructed, along with internal and external fencing.

CONSTRUCTION OF RAMPS AND HYGIENE FACILITIES FOR ACCESS AND SERVICE OF PEOPLE WITH DISABILITIES IN SCHOOL UNITS OF THE MUNICIPALITY OF ELASSONA

PROJECT TITLE: “Construction of ramps and hygiene facilities for access and service of people with disabilities in school units of the Municipality of Elassona”

OPERATIONAL PROGRAM: PHILODEMOS II

CALL: CALL IX: 29878 / 18-04-2019

INTEGRATION DECISION: 17403 / 09-04-2020

BENEFICIARY: MUNICIPALITY OF ELASSONA

PROJECT OWNER: MUNICIPALITY OF ELASSONA

INTEGRATION BUDGET, (TOTAL): €153,450.00

INTEGRATION BUDGET, (ELIGIBLE EXPENDITURE): €53,285.52

OBJECTIVES/RESULTS: Ensuring unimpeded access for people with disabilities to school premises in the Municipality of Elassona

Construction of ramps and hygiene facilities to serve people with disabilities in the school premises of the Municipality of Elassona. It is noted that these constructions will be carried out in accordance with the applicable technical specifications of the Ministry of Environment and Energy, as well as in accordance with the legislation on accessibility for people with disabilities in public buildings and public spaces, as amended and currently in force.

PREPARATION OF STUDIES AND IMPLEMENTATION OF FIRE PROTECTION MEASURES AND MEANS IN THE SCHOOL UNITS OF THE MUNICIPALITY OF ELASSONA

PROJECT TITLE: PREPARATION OF STUDIES AND IMPLEMENTATION OF FIRE PROTECTION MEASURES AND MEANS IN THE SCHOOL UNITS OF THE MUNICIPALITY OF ELASSONA

OPERATIONAL PROGRAM: PHILODEMOS II

CALL: CALL VIII: 29816 / 18-04-2019

INTEGRATION DECISION: 15523 / 04-03-2020

BENEFICIARY: MUNICIPALITY OF ELASSONA

PROJECT OWNER: MUNICIPALITY OF ELASSONA

INTEGRATION BUDGET, (TOTAL): €202,120.00

INTEGRATION BUDGET, (ELIGIBLE EXPENDITURE): €202,120.00

The purpose of this specific action is to install the necessary fire protection equipment in school units to ensure greater safety in these areas that host children. With the equipment to be installed, school units will be protected in case of fire or any source of ignition.

The project includes the preparation of new fire protection studies, including the necessary plans and technical descriptions of permanent fire protection systems, and the preparation and delivery of tender documents for the implementation of the fire protection measures and means foreseen in the study. Subsequently, after the tendering of the project, the implementation and maintenance of the measures and means, approved by the Fire Service, of the fire protection studies, concerning the installation or replacement and inspection of the proper functioning of portable, permanent and other active fire protection means and systems in school units, will follow.

REPAIR, MAINTENANCE OF SCHOOL BUILDINGS & COURTYARDS OF THE MUNICIPALITY OF ELASSONA

PROJECT TITLE: “Repair, maintenance of school buildings & courtyards of the Municipality of Elassona”

OPERATIONAL PROGRAM: PHILODEMOS II

CALL: CALL II: 5133 / 23-02-2018

INTEGRATION DECISION: 46741 /06-09-2018

BENEFICIARY: MUNICIPALITY OF ELASSONA

PROJECT OWNER: MUNICIPALITY OF ELASSONA

INTEGRATION BUDGET, (TOTAL): €719,800.00

INTEGRATION BUDGET, (ELIGIBLE EXPENDITURE): PDE MINISTRY OF INTERIOR SAE 055 2017SE05500010 €118,500.00

The proposed interventions aim to improve the infrastructure of Primary and Secondary Education in the Municipality of Elassona. Most of the buildings included in the proposal were constructed in the 1970s and present several problems. The repair and maintenance works of the school buildings and courtyards address existing deficiencies and replace worn-out and unsuitable infrastructure, taking into account the safety of students.

The construction of the project will result in the upgrading of the material and technical infrastructure in the field of education by creating a safe, modern, and quality environment for students.

The project includes maintenance and repair works in the building and courtyard of the Elassona Municipal Unit High School, in the courtyard of the Elassona Municipal Unit Junior High School, in the building of the Krania Municipal Unit Junior High School, and the school complex of the Livadi Municipal Unit.

SUPPLY OF CONSTRUCTION MACHINERY, VEHICLES AND/OR ANCILLARY EQUIPMENT

PROJECT TITLE: “Supply of construction machinery, vehicles and/or ancillary equipment”.

OPERATIONAL PROGRAM: PHILODEMOS II

CALL: CALL I: 5132/23-02-2018

INTEGRATION DECISION: 48433/13-09-2018

BENEFICIARY: MUNICIPALITY OF ELASSONA

PROJECT OWNER: MUNICIPALITY OF ELASSONA

INTEGRATION BUDGET, (TOTAL): €350,000.00

INTEGRATION BUDGET, (ELIGIBLE EXPENDITURE): PDE MINISTRY OF INTERIOR SAE 055 2017SE05500010 €305,000.00

The purpose of the proposed procurement is to strengthen the technical infrastructure and, by extension, the services, for the better satisfaction of citizens’ daily needs.

The Municipality of Elassona is the second largest municipality in Greece in terms of area and includes a very large network of rural roads, mainly in mountainous and semi-mountainous terrains, which connects residents with livestock and agricultural farms that constitute their main occupation. The procurement of a grader is essential for the shaping of the rural road network, which faces problems mainly during the winter period and after rainfall throughout the year, to ensure accessibility for residents with the aim of improving the competitiveness of products and strengthening the balanced and fair development of the Municipality.

Supply of construction machinery for the Municipality of Elassona

SUPPLY OF 1 NEW EARTH GRADER (GRADER) 150-200 Hp